Begin with Saleable Volume
Capacity planning should start with the amount of packed product the market is expected to absorb. Distributor forecasts, launch plans and seasonal peaks provide a more useful starting point than selecting a machine size from a catalogue.
Separate confirmed demand from aspirational growth so the first project remains commercially disciplined.
- Monthly sales target
- Pack size and units per case
- Seasonality
- Inventory policy
Convert Demand into Production Hours
The same monthly volume can require very different line capacities depending on shifts, operating days and planned sanitation time. Use realistic hours rather than assuming uninterrupted production.
Include planned maintenance, product changes and the learning curve of a new operation when estimating available time.
- Shifts per day
- Operating days per month
- Cleaning and changeover time
- Planned maintenance
Use Realistic Line Efficiency
Nameplate speed is not the same as saleable output. Startup, minor stops, process adjustment, packaging availability and quality rejection all reduce effective production.
A capacity model should show both the design rate and the expected operating rate so commercial decisions are not based on the best possible hour.
Plan a Credible Expansion Path
Expansion may come from longer operating hours, faster packaging, additional forming capability or a second line. The right route depends on where the first system is likely to reach its constraint.
Reserve space, utility capacity and material flow for the next stage when the business case is clear, but avoid paying for undefined flexibility.
- Available factory space
- Utility reserve
- Packaging bottlenecks
- Future product categories