Quality Control

Two Quality Systems.

Machinery quality follows an ISO 9001-controlled delivery process; food production follows ISO 22000 and HACCP controls through packing and dispatch.

Wanttone biscuit equipment arranged on both sides of the assembly workshop aisle in Yangjiang

Control Structure

Different Outputs. Different Controls.

A machine must be built, inspected, tested and commissioned. A biscuit must move safely and consistently from raw material to finished pack. The two systems are connected, but they are not interchangeable.

Machinery System

ISO 9001 structures equipment manufacturing, inspection, handling of nonconforming parts and corrective action.

Food System

ISO 22000 and HACCP structure food-safety responsibilities and critical controls throughout commercial production.

Machinery Quality Flow

Components to Commissioning.

The machinery process is designed around the agreed line scope and closes only after operation, installation and handover have been addressed.

  1. Incoming Inspection

    Materials and purchased components are checked before they enter assembly.

  2. Production & Assembly

    Fabrication, machining and assembly follow the confirmed equipment and line scope.

  3. Inspection & Factory Testing

    Completed equipment is inspected and tested against the agreed configuration before shipment.

  4. Installation & Commissioning

    Technician dispatch, installation, tuning and operator handover close the delivery loop.

Food Quality Flow

Intake to Storage.

The food process combines recipe execution, time and temperature control, detection, packaging and release within the certified food operation.

  1. Incoming Materials

    Supplier and material checks begin the documented food process.

  2. Mixing

    Recipes and batch conditions are controlled before forming.

  3. Forming

    Equipment settings shape the product to the confirmed specification.

  4. Baking

    Time and temperature control the bake and final product structure.

  5. Cooling

    Controlled cooling protects texture before packing.

  6. Detection & Packing

    Metal detection and packaging controls protect the finished product.

  7. Warehousing

    Finished goods are stored and released through the export workflow.

Product Commitments

Verifiable Commercial Claims.

Product claims and project acceptance criteria are reviewed against the agreed recipe, pack, destination and inspection scope.

Zero Trans Fat

Available recipes are developed around a zero-trans-fat basis where confirmed for the selected product.

10-Month Shelf-Life Basis

The stated shelf-life basis depends on the confirmed product, packaging, storage and distribution conditions.

Export Workflow

Production records, packing and dispatch documentation support the agreed export route.

Available Verification

  • Factory visits
  • Third-party inspection
  • Sample approval before order confirmation
  • Current certificate copies
  • Customer references where appropriate

Scope Limits

Match every certificate, shelf-life statement and customer reference to the exact product or equipment scope it documents.